Well No.   NC-EWDP-19IM1 SITE SUMMARY

Status:  Completed.  Drilled to a total depth of 1012.5 feet.

Latitude/Longitude (Datum NAD-83):   
  36o 40' 14.615" North
116o 26' 56.397" West

Legal Description:   
Township 15S Range 49E  Section 3 SW 1/4 SE 1/4

Elevation (Datum NGDV-29): 
819.09 meters AMSL (2,687.61 feet) GPS

Access: From the intersection of Highway 95 and Highway 373, go west on Highway 95 approximately 0.2 miles to the intersection of Highway 95 and the Gate 510 road, go north 1.8 miles to Powerline Road, turn left (west) just south of the 510 gate, and continue 2.5 miles along Powerline Road.

Purpose:  NC-EWDP-19IM1 is a multiple screen monitoring well. Primary technical objectives include: 1) drill and complete the well in the alluvial and upper Tertiary aquifer; 2) identify lithostratigraphic contacts, potential production zones, and structural features; 3) identify coarse grained  intervals that may serve as preferred flow paths; 4) screen and develop multiple zones of interest and obtain aquifer property data; 5) obtain long-term pressure and temperature data and water quality (chemistry) data.