NUMBER |
TITLE |
REV |
DATE |
CHANGE NOTICES |
RID |
POLICY DOCUMENTS |
QAPP |
Quality
Assurance Program Plan |
Rev. 4 |
6/15/03 |
|
6309 |
QUALITY ADMINISTRATIVE PROCEDURES |
QAP-3.1 |
Independent Technical
Review |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-3.2 |
Documentation of Technical
Investigations |
Rev. 2 |
3/31/04 |
|
6309 |
QAP-5.1 |
Preparation of Quality
Administrative Procedures |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-5.2 |
Preparation of Work Plans,
Test Plans, and Technical Procedures |
Rev. 2 |
3/31/04 |
|
6309 |
QAP-6.1 |
Issue and Control of
Quality Assurance Documents |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-7.1 |
Procurement of Items and
Services |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-8.1 |
Sample Management |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-12.1 |
Control of Measuring and
Test Equipment |
Rev. 2 |
3/31/04 |
|
6309 |
QAP-15.1 |
Control of Nonconforming
Items or Activities |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-16.1 |
Corrective Action |
Rev. 1 |
3/31/04 |
|
6309 |
QAP-17.1 |
Records Management |
Rev. 3 |
11/15/07 |
|
6309 |
QAP-18.1 |
Audits and Surveillances |
Rev. 1 |
3/31/04 |
|
6309 |
OBSOLETE OR SUPERSEDED
WORK PLANS |
WP-1 |
Nye County /
YMP Yucca Mountain Oversight Drilling Program |
Rev. 1 |
12/02/94 |
|
7321 |
WP-2 |
Monitoring
Underground Meteorological Conditions Exploratory Surface Facility
(ESF) |
Rev. 1 |
10/27/98 |
|
7321 |
WP-3 |
Gaseous
Geochemical Testing and Sampling in ONC#1 |
Rev. 1 |
10/20/97 |
Ch. 1 3/16/98 |
7321 |
WP-5.0 |
Phase V Drilling and Well
Construction |
Rev. 6 |
3/16/06 |
|
7321 |
WP-7 |
Death Valley
Hydrogeology Studies Program |
Rev. 2 |
11/02/98 |
|
7321 |
WP-8.0 |
Sample Management |
Rev. 4 |
5/31/05 |
Ch. 1 11/30/05 |
7321 |
WP-11 |
Groundwater Chemistry
Sampling and Analysis |
Rev. 0 |
9/26/03 |
|
7321 |
OBSOLETE OR
SUPERSEDED TEST PLANS |
TPN-5.1 |
Construction of Sonic Corehole NC-EWDP-19PB |
Rev. 0 |
11/15/03 |
|
7380 |
TPN-5.2 |
Data Collection at the Amargosa Valley Science and Technology Park
Production Well |
Rev. 0 |
11/20/03 |
|
7380 |
TPN-5.3 |
Construction of Sonic Corehole NC-EWDP-22PC |
Rev. 1 |
11/13/04 |
|
7380 |
TPN-5.4 |
Data Collection at the U.S. Department of Energy Volcanic Hazard
Boreholes in the Vicinity of Lower Fortymile Wash |
Rev. 0 |
11/07/05 |
|
7380 |
TPN-5.6 |
Drilling, Well Construction and Testing of Groundwater Evaluation
Piezometer Wells, Southern Nye County |
Rev. 0 |
5/10/10 |
|
7380.04 |
TPN-6.1 |
Thermal Logging in Early Warning Drilling Program Wells Using
Sensornet Equipment |
Rev. 0 |
6/19/06 |
|
7380 |
TPN-6.2 |
Thermal Logging in Early Warning Drilling Program Wells and
Laboratory Using Agilent Distributed Temperature Perturbation Sensor
Technology |
Rev. 0 |
9/18/07 |
|
7380 |
TPN-6.3 |
Pumping Tests with Thermal
Logging in Early Warning Drilling Program Wells Using Distributed
Temperature Sensor Equipment |
Rev. 0 |
11/1/10 |
|
7380.07 |
TPN-6.3 |
Pumping Tests with Thermal
Logging in Early Warning Drilling Program Wells Using Distributed
Temperature Sensor Equipment |
Rev. 1 |
11/10/11 |
|
7380.09 |
TPN-6.3 |
Pumping Tests with Thermal
Logging in Early Warning Drilling Program Wells Using Distributed
Temperature Sensing Equipment |
Rev. 1 |
11/10/11 |
Ch. 1
11/15/11 |
7380.09 |
TPN-8.1 |
Constant Head Saturated Hydraulic Conductivity Measurements on
Repacked Core Samples |
Rev. 0 |
4/01/04 |
|
7380 |
TPN-9.1 |
Pump Test of Individual Screens in NC-EWDP-22S |
Rev. 0 |
7/30/03 |
|
7380 |
TPN-9.2 |
Single-Well Push/Pull Tracer Tests at Well NC-EWDP-22S |
Rev. 0 |
11/18/04 |
|
7380 |
TPN-9.3 |
Cross-Hole, Multiple-Well Tracer Test at Site 22 |
Rev. 0 |
11/18/04 |
|
7380 |
TPN-9.5 |
Natural Gradient Cross-Hole Tracer Test at Site 22 |
Rev. 0 |
1/31/06 |
Ch. 1 11/01/06 |
7380 |
TPN-9.5 |
Natural Gradient
Cross-Hole Tracer Test at Site 22 |
Rev. 0 |
1/31/06 |
Ch. 2 09/05/08 |
7380.02 |
TPN-11.1 |
Groundwater Sampling and Analysis of Early Warning Drilling Program
(EWDP) Wells, August through November 2003 |
Rev. 0 |
9/26/03 |
|
7380 |
TPN-11.2 |
Groundwater Sampling and Analysis of WT Wells, April 2005 |
Rev. 0 |
4/19/05 |
|
7380 |
TPN-11.3 |
Groundwater Sampling and Analysis of Early Warning Drilling Program
Wells, 2005 to 2006 |
Rev. 0 |
9/15/05 |
Ch. 1 4/10/06 |
7380 |
TPN-11.5 |
Long-Term Arsenic Characterization at NC-EWDP-4PD |
Rev. 0 |
8/26/10 |
|
7380.05 |
TPN-11.6 |
Groundwater Sampling and Analysis of Groundwater Evaluation Program
Wells |
Rev. 0 |
4/26/11 |
|
7380.08 |
TPN-12.1 |
Test Plan for Seismic
Reflection Survey Near NC-EWDP-29P |
Rev. 0 |
10/01/07 |
|
7380 |
OBSOLETE
OR SUPERSEDED TECHNICAL
PROCEDURES |
TP-7.0 |
Drill Site Management |
Rev. 3 |
9/30/02 |
|
7385 |
TP-8.0 |
Field Collection, Logging
and Processing of Borehole Geologic Samples |
Rev. 5 |
11/15/03 |
|
7385 |
TP-8.1 |
Field Collection and
Handling of Water Samples |
Rev. 2 |
7/15/02 |
|
7385 |
TP-8.1 |
Field Collection and
Handling of Water Samples |
Rev. 3 |
05/05/09 |
|
7385.04 |
TP-8.2 |
Thin Section Preparation Procedure |
Rev. 0 |
6/16/00 |
|
7385 |
TP-8.3 |
Sample Collection, Identification and Control for
Mineralogy-Petrology Studies |
Rev. 0 |
9/15/00 |
|
7385 |
TP-8.4 |
Binocular Microscope for Fracture and VUG Mineralogy Studies |
Rev. 0 |
9/15/00 |
|
7385 |
TP-8.5 |
Petrography and Modal Analysis Procedure |
Rev. 0 |
9/25/00 |
|
7385 |
TP-8.6 |
X-Ray Diffraction Procedure |
Rev. 0 |
10/15/00 |
|
7385 |
TP-8.7 |
SEM, TEM, Electron Microprobe Procedure |
Rev. 0 |
11/01/00 |
|
7385 |
TP-8.9 |
Differential Spectrometry (K, U, T) for Core, Cuttings, and Other
Samples |
Rev. 0 |
11/06/00 |
|
7385 |
TP-9.1 |
Computer Modeling Quality Assurance Procedure |
Rev. draft |
4/30/93 |
|
7385 |
TP-9.2 |
Procedures for Operating
Westbay®
Mosdax® Groundwater Monitoring Equipment
in Nye County Wells |
Rev. 2 |
3/16/05 |
|
7385 |
TP-9.3 |
Instrumentation, Calibration, Collection and Processing of Data in
ESF Tunnels |
Rev. 0 |
10/27/98 |
|
7385 |
TP-9.4 |
Gas Sampling Procedure of ONC#1 and Other Westbay Instrumented Wells |
Rev. 1 |
10/20/97 |
Ch. 2 11/13/98 |
7385 |
TP-9.4 |
Gas Sampling Procedure of ONC#1 and Other Westbay Instrumented Wells |
Rev. 1 |
10/20/97 |
Ch. 2 11/13/98 |
7385 |
TP-9.8 |
Development of GPS Data
Using the Trimble®
GeoXH GPS |
Rev. 1 |
1/07/08 |
|
7385 |
TP-9.9 |
Measurement of Groundwater
Levels Using Electric Well Sounders |
Rev. 3 |
9/04/03 |
Ch. 1 2/28/06 |
7385 |
TP-11.1 |
Runoff
Sampler Construction, Field Sample Collection, and handling of
Surface Runoff Water Samples |
Rev. 0 |
11/20/08 |
|
7385.03 |