NUMBER |
TITLE |
REV |
DATE |
CHANGE NOTICES |
RID |
POLICY DOCUMENTS |
QAPP |
Quality
Assurance Program Plan |
Rev. 5 |
7/9/08 |
|
6309.01 |
QUALITY ADMINISTRATIVE PROCEDURES |
QAP-3.1 |
Independent Technical
Review |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-3.2 |
Documentation of Technical
Investigations |
Rev. 3 |
9/17/08 |
|
6309.01 |
QAP-5.1 |
Preparation of Quality
Administrative Procedures |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-5.2 |
Preparation of Work Plans,
Test Plans, and Technical Procedures |
Rev. 3 |
9/17/08 |
|
6309.01 |
QAP-6.1 |
Issue and Control of
Quality Assurance Documents |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-7.1 |
Procurement of Items and
Services |
Rev. 2 |
9/17/08 |
Ch. 1 05/17/10 |
6309.02 |
QAP-8.1 |
Sample Management |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-12.1 |
Control of Measuring and
Test Equipment |
Rev. 3 |
9/17/08 |
|
6309.01 |
QAP-15.1 |
Control of Nonconforming
Items or Activities |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-16.1 |
Corrective Action |
Rev. 2 |
9/17/08 |
|
6309.01 |
QAP-17.1 |
Records Management |
Rev. 4 |
9/17/08 |
|
6309.01 |
QAP-18.1 |
Audits and Surveillances |
Rev. 2 |
9/17/08 |
|
6309.01 |
WORK PLANS |
WP-4 |
Aquifer Testing Plan for
Nye County's Independent Scientific Investigations Program |
Rev. 1 |
2/14/02 |
|
7321 |
WP-5.0 |
Phase VI Drilling and Well
Construction |
Rev. 7 |
5/28/08 |
|
7321.1 |
WP-6 |
Early Warning Drilling
Program Geophysical Logging Work Plan |
Rev. 1 |
5/31/01 |
|
7321 |
WP-8.0 |
Sample Management |
Rev. 5 |
5/28/08 |
|
7321.1 |
WP-9 |
Work Plan for Tracer
Testing |
Rev. 0 |
7/30/03 |
|
7321 |
WP-10 |
Groundwater Level
Monitoring and Evaluation |
Rev. 0 |
8/20/03 |
Ch. 2 2/28/06 |
7321 |
WP-11 |
Groundwater
and Surface Runoff Water Chemistry
Sampling and Analysis |
Rev. 1 |
11/20/08 |
|
7321.02 |
WP-12.0 |
Surface Geophysical
Surveys |
Rev. 0 |
8/20/07 |
|
7321 |
WP-13.0 |
Borehole and Site Security Plan |
Rev. 0 |
2/10/09 |
|
7321.03 |
TEST PLANS |
TPN-5.5 |
Data
Collection During Well Completion Activities at NC-EWDP-2DB |
Rev. 0 |
6/20/08 |
|
7380.1 |
TPN-5.6 |
Drilling, Well Construction and Testing of Groundwater Evaluation
Piezometer Wells, Southern Nye County |
Rev. 1 |
4/22/2013 |
|
7380.11 |
TPN-6.3 |
Pumping Tests with Thermal
Logging in Early Warning Drilling Program Wells Using Distributed
Temperature Sensing Equipment |
Rev. 2 |
3/06/12 |
|
7380.09 |
TPN-9.5 |
Natural Gradient
Cross-Hole Tracer Test at Site 22 |
Rev. 1 |
9/25/09 |
Ch. 1 10/29/09 |
7380.03 |
TPN-11.4 |
Groundwater Sampling and
Analysis of Selected Inyo County Wells, 2008 |
Rev. 2 |
2/12/08 |
|
7380 |
TPN-11.5 |
Long-Term Arsenic Characterization at NC-EWDP-4PD |
Rev. 0 |
8/26/10 |
Ch. 1
9/22/10 |
7380.06 |
TPN-11.6 |
Groundwater Sampling and Analysis of Groundwater Evaluation Program
Wells |
Rev. 1 |
10/19/12 |
|
7380.10 |
TPN-11.7 |
Groundwater Sampling and Analysis of Pahrump Valley Springs,
Artesian and Other Selected Wells |
Rev. 0 |
2/24/12 |
|
7380.09 |
TPN-12.1 |
Test Plan for Seismic
Reflection Survey Near the Southwest Corner of the Nevada Test Site |
Rev. 1 |
11/02/09 |
|
7380.03 |
TPN-12.2 |
Collection of Ground-Based
Gravity and Magnetic Data in the Crater Flat, Jackass Flat, and
Amargosa Valley Areas, 2008 |
Rev. 0 |
1/22/08 |
|
7380 |
TECHNICAL
PROCEDURES |
TP-7.0 |
Drill Site Management |
Rev. 4 |
5/28/08 |
|
7385.1 |
TP-8.0 |
Field Collection, Logging
and Processing of Borehole Geologic Samples |
Rev. 6 |
5/29/08 |
|
7385.1 |
TP-8.1 |
Field Collection and
Handling of Water Samples |
Rev. 4 |
01-10-12 |
|
7385.06 |
TP-8.8 |
Magnetic Susceptibility
for Core, Cuttings, and Other Samples |
Rev. 0 |
11/02/00 |
|
7385 |
TP-9.0 |
Pump-Spinner in Unscreened
Open Boreholes and Screened Boreholes |
Rev. 1 |
2/14/02 |
|
7385 |
TP-9.2 |
Procedures for Operating
Westbay®
Mosdax® Groundwater Monitoring Equipment
in Nye County Wells |
Rev. 2 |
3/16/05 |
Ch. 1 8/18/2008 |
7385.02 |
TP-9.5 |
Variable Scale Pumping
Tests in Unscreened Open Boreholes or in Screened Boreholes, With or
Without Observation Wells |
Rev. 1 |
2/15/02 |
|
7385 |
TP-9.6 |
Slug Testing of Individual
Pumping Ports |
Rev. 0 |
1/18/99 |
|
7385 |
TP-9.7 |
Analysis of Pressure
Transient Tests |
Rev. 0 |
2/23/99 |
|
7385 |
TP-9.8 |
Development of GPS Data
Using the Trimble®
GeoXH GPS |
Rev. 2 |
10/25/10 |
|
7385.05 |
TP-9.9 |
Measurement of Groundwater
Levels Using Electric Well Sounders |
Rev. 4 |
8/6/09 |
|
7385.04 |
TP-10.0 |
Pumping/Injection Tests of
Packed-Off Zones in Unscreened Open Boreholes or in Multiple Screen
Boreholes With or Without Observation Wells |
Rev. 0 |
2/15/02 |
|
7385 |
TP-11.0 |
Borehole Geophysical
Logging Data Identification and Acceptance |
Rev. 0 |
8/28/02 |
|
7385 |
TP-11.1 |
Runoff
Sampler Construction, Field Sample Collection, and handling of
Surface Runoff Water Samples |
Rev. 1 |
2/24/09 |
|
7385.03 |
TP-17.1 |
Licensing Support Network
(LSN) Procedures and Certifications |
Rev. 0 |
11/16/07 |
|
7385 |
|